Construction Progress of the Central Hills Residential Complex as of July 17, 2026

Back

IMG_7486
IMG_7491
IMG_7497
IMG_7503
IMG_7504
IMG_7509
IMG_7515
IMG_7516
IMG_7521
IMG_7527
IMG_7533
IMG_7539
IMG_7545
IMG_7546
IMG_7551
IMG_7552
IMG_7340
IMG_7342
IMG_7343
IMG_7345
IMG_7396
IMG_7402
IMG_7408
IMG_7410
IMG_7414
IMG_7420
IMG_7421
IMG_7422
IMG_7426
IMG_7432
IMG_7445
IMG_7450
IMG_7451
IMG_7456
IMG_7457
IMG_7462
IMG_7475
IMG_7479
IMG_7480
IMG_7485

Construction Progress of the Central Hills Residential Complex as of July 17, 2026

Construction Progress of the Central Hills Residential Complex as of July 17, 2026

At Slate Tower, monolithic construction work is underway on the 18th floor, and concrete has been delivered for the construction of the building's structural frame.

Window installation continues at Ruby Tower: double-pane windows have been installed from the 2nd to the 25th floor. Interior walls are being built on the 26th floor. Exterior and interior walls and partitions have been completed from the 2nd to the 25th floor.