Central Hills' traditional weekly construction report.

As of 18.07:

Building 2
• Installation of reinforced frames on the floor slab above the 3rd floor.
• Installation of beam frames of the floor slab above the 3rd floor.

Building 3
• Masonry of internal walls on the 11th floor continues.