Construction progress of the Central Hills RC as of March 7, 2024
Construction progress of the Central Hills residential complex as of March 7, 2024
🏠 Building № 2:
• Arrangement of the concrete mixture of the floor slab of the 6th floor.
• Concreting of vertical elements of the 7th floor. Installation of staircases on the 4th floor.