November 3, 2025

Back

й1ї
й2 (7)
й3 (7)
й5 (7)
й6 (7)
й8 (6)
й9 (6)
й10 (5)

Progress of construction of the Central Hills residential complex as of November 3, 2025

Progress of construction of the Central Hills residential complex as of November 3, 2025

🏢 Slate Tower
• Installation of ventilation units on the 14th floor has been completed.
• Reinforcement and installation of vertical structures on the 15th floor has been completed.
• Concreting of the 15th floor pylons has been completed.

🏢 Ruby Tower
• External walls from the 20th to the 26th floor have been erected in the footnote areas.
• Materials for building internal walls on the 23rd floor have been delivered.
• Window frames have been installed up to the 20th floor.