Construction progress of the Central Hills RC as of December 22, 2023
We would like to share with you the latest news from the construction site of the CENTRAL HILLS RC.
🏠 Building №2:
• Concreting of vertical structures (pylons and walls) of the 5th floor is being carried out.
• Reinforcement of pylon frames and formwork of vertical structures of the 5th floor is being carried out.
• Grinding of concrete surfaces on the 3rd floor is being carried out.
🏠 Building №3:
• Masonry of internal walls and partitions on the 18th floor continues.