As of 21.07:
🏗️Building 2
• Concrete is being poured for the floor slab above the 3rd floor.
🏗️Building 3
• Masonry of internal partitions and technological shafts is being carried out on the 11th floor.
• Installation of ventilation units is being carried out on the 21st floor.