July 21, 2023

Back

y2
y3
y4-1
y5
y1-1

Central Hills' traditional weekly construction report.

As of 21.07:

🏗️Building 2
• Concrete is being poured for the floor slab above the 3rd floor.

🏗️Building 3
• Masonry of internal partitions and technological shafts is being carried out on the 11th floor.
• Installation of ventilation units is being carried out on the 21st floor.