Construction progress of the Central Hills RC as of March 22, 2024

Construction progress of the Central Hills residential complex as of March 22, 2024

🏠 Building №2:
• Installation of the metal frame of the 8th floor plate is in progress.
• Metal frames of vertical elements of the 8th floor are being manufactured.