Construction progress of the Central Hills residential complex as of November 14, 2023
🏗️ Building 2
• The formwork of the floor slab of the 4th floor is being installed.
🏗️ Building 3
• Dismantling of the floor slab formwork on the 27th floor is underway.
• Masonry of internal walls and partitions on the 17th floor is in progress.
A number of preparatory works have been carried out: connecting the power supply, setting up uninterrupted street lighting, choosing a place and repairing the future sales department, adjusting the general plan of the residential quarter.