Construction progress of the Central Hills RC as of March 1, 2024

Construction progress of the Central Hills residential complex as of March 1, 2024

🏠 Building № 2:
• Arrangement of the concrete mixture of the floor slab of the 6th floor.
• Reinforcement of the vertical structures of the 7th floor and preparation for their installation is underway.